Vol. 02 · No. 07 A MYNT Systems publication Santa Cruz, California · July 2026

The Wire

Energy, demystified, and put back in your hands.

How It Works · Moss Landing, California

What Moss Landing actually tells us about battery safety.

The fire everyone heard about, and the decade of engineering that makes it a story about the past, not the future.

In January 2025, a fire at the Moss Landing Energy Storage Facility put grid batteries on the front page. If your only exposure to battery storage is that headline, the takeaway feels obvious: batteries are risky. The engineering record says something much more specific, and much more useful.

The burned facility was a 2018 design, and a globally unique one. The industry moved on from it years ago: the chemistry changed, the enclosures changed, and the code caught up.

Continue reading →
The Moss Landing Energy Storage Facility
Fig. 01 · Moss Landing, CaliforniaJan 2025
By the Numbers · Battery safety since Moss Landing
2021

The year Tesla moved its Megapack product to LFP, the safer battery chemistry.

167-C

The CPUC fire-safety order adopted in March 2025, on top of NFPA 855.

1

Containers involved when fire broke out next door to Moss Landing in 2022. It never spread.

100%

Of the batteries MYNT specifies are LFP, in modular enclosures, built to current code.

In this issue

Envisioning the new grid

Distributed generation is turning the one-way grid into a two-way marketplace. Where the wires go next, and where the money follows.

Industry · In the archive

What RECs actually do

Renewable energy certificates, explained in plain English: what you are actually buying, what you are not, and when they make sense.

Your Power · In the archive

Hardware field notes

Notes from our install crews on the racking, inverters, and batteries that hold up on real roofs, in real weather, year after year.

From the Field · In the archive

From the Field

Building MYNT: our ongoing series documenting the future of energy.

Immerse yourself in our world and learn where the energy industry is headed, one project at a time.

Fig. 02 · Building MYNT · Latest episode▶ Watch
Crew breaking ground on a MYNT project
EP 01 · Breaking ground
Panel installation in progress
EP 02 · The install
Commissioned system powering on
EP 03 · Power on

The Reading Room

Every issue of The Wire lives in the archive. Request access and the next dispatch lands in your inbox each month: the state of the industry, what we are paying attention to, and what is coming next. 4,000+ readers are already inside.

Free · Monthly · Unsubscribe any time

The WireA MYNT Systems publication Published monthly111 Mission Street, Santa Cruz, California Edited byThe MYNT newsroom · Set in Sora and Inter Vol. 02 · No. 07July 2026 · myntsystems.com

Keep exploring: the Moss Landing breakdown, our mission, and the crew behind MYNT.

Back to concepts